Photoreal Encino two-unit house and materials for an SB9 budget review, no people or dollar signs

FAQ

Which permits and approvals should I plan for with a SB9 lot split project in Los Angeles?

An SB9 lot split in Los Angeles is an urban lot split, not a conventional parcel map. Plan for a survey, easements, separate APNs, and Bureau of Engineering plus Planning. Building permits come later. 121 Design Build in Encino maps that sequence. This page is not legal advice.

Direct answer

An urban lot split under SB9 is not a conventional parcel map.

Which permits and approvals you should plan for with an SB9 lot split project in Los Angeles start with the urban lot split itself: survey, easements, and separate APNs, then BOE and Planning. Building permits are a later step after the parcels exist.

121 Design Build can coordinate the SB9 lot split Los Angeles path from Encino. Call (424) 600-2100 or email info@121designbuild.com.

We do not invent Encino fees or give legal advice. City forms and title conditions are confirmed with the agencies and the surveyor.

What an SB9 lot split actually files

Survey, easements, separate APNs, then building permits later.

Photoreal Encino two-unit house with construction materials, no logos or text

Survey and easements

A survey and easement map come first so the urban lot split can be drawn against real property lines, not a guess on an Encino ranch lot.

Separate APNs

Separate APNs are the point of an SB9 lot split. Bureau of Engineering and Planning review that split. Building permits wait until the parcels exist.

Building permits later

121 Design Build will not invent which form LADBS wants after the split. Call (424) 600-2100.

Photoreal Encino Los Angeles two-unit lot and finish materials, no dollar signs

Encino SB9 lot split

Survey stakes and two Encino lots after an SB9 lot split.

121 Design Build is on Ventura Boulevard in Encino. An SB9 lot split is mapped to your address, easements, and whether two APNs can be created.

We do not invent a parcel map shortcut. For urban lot split permits in general, see our urban lot split permits page. Building a house is a later conversation.

How we work

How 121 sequences an SB9 lot split in Encino

Photoreal Encino two-unit house and material samples, no diagrams

01

1. Survey

A licensed survey draws the proposed line, existing house, and access so the urban lot split is not a sketch.

02

2. Easements

Easements for driveways, utilities, and drainage are listed before BOE and Planning will treat two lots as real.

03

3. BOE and Planning

Bureau of Engineering and Planning review the SB9 lot split. This is not a conventional parcel map hearing.

04

4. Building later

Building permits are a later step after separate APNs exist. Call (424) 600-2100.

Honest scope

What we file, and what we do not invent.

We do

What we file

We file survey, easements, separate APNs, and BOE plus Planning for an SB9 lot split Los Angeles conversation. Building permits wait.

We do not

What we do not invent

We do not invent Encino fees, a guaranteed APN date, or legal conclusions about your title. This is not legal advice.

Ask about SB9 lot split permits on your Encino lot.

If you have an SB9 lot split in Encino or greater Los Angeles, start with survey, easements, and whether two APNs can be created before anyone talks building permits. Call (424) 600-2100.