
FAQ
Which permits and approvals should I plan for with a SB9 lot split project in Los Angeles?
An SB9 lot split in Los Angeles is an urban lot split, not a conventional parcel map. Plan for a survey, easements, separate APNs, and Bureau of Engineering plus Planning. Building permits come later. 121 Design Build in Encino maps that sequence. This page is not legal advice.
Direct answer
An urban lot split under SB9 is not a conventional parcel map.
Which permits and approvals you should plan for with an SB9 lot split project in Los Angeles start with the urban lot split itself: survey, easements, and separate APNs, then BOE and Planning. Building permits are a later step after the parcels exist.
121 Design Build can coordinate the SB9 lot split Los Angeles path from Encino. Call (424) 600-2100 or email info@121designbuild.com.
We do not invent Encino fees or give legal advice. City forms and title conditions are confirmed with the agencies and the surveyor.

Encino SB9 lot split
Survey stakes and two Encino lots after an SB9 lot split.
121 Design Build is on Ventura Boulevard in Encino. An SB9 lot split is mapped to your address, easements, and whether two APNs can be created.
We do not invent a parcel map shortcut. For urban lot split permits in general, see our urban lot split permits page. Building a house is a later conversation.
Honest scope
What we file, and what we do not invent.
We do
What we file
We file survey, easements, separate APNs, and BOE plus Planning for an SB9 lot split Los Angeles conversation. Building permits wait.
We do not
What we do not invent
We do not invent Encino fees, a guaranteed APN date, or legal conclusions about your title. This is not legal advice.
Ask about SB9 lot split permits on your Encino lot.
If you have an SB9 lot split in Encino or greater Los Angeles, start with survey, easements, and whether two APNs can be created before anyone talks building permits. Call (424) 600-2100.


