Can I make changes to the design during the process?

Yes. Feedback during schematic, design development, and later. Later changes cost more time and money.

Direct answer

Feedback is welcome. Later costs more.

Yes, we welcome feedback throughout the design process. Whether it's during schematic design, design development, or even later in the project, we'll work with you to make adjustments as needed.

That is the Encino / Los Angeles design-build practice. Later changes still cost more time and money. We are honest about that; we do not invent a fee schedule here.

City of Los Angeles reviews can also lock some choices. This is not legal advice.

When changes still fit

Schematic, design development, and later — with a cost.

Editorial diagram of one Encino house with a single design-build team versus a split architect and contractor handoff

Schematic design

Early drawings are the cheapest place to change direction. We welcome that feedback while the Encino team is still shaping the idea.

Design development

As materials, layout, and structure firm up, we still work with you on adjustments. Some choices start to cost more time and money.

Later in the project

Yes, later changes are still possible. They usually cost more time and money, and City of Los Angeles reviews can lock some of the work. We say that plainly. We do not invent a fee here.

Editorial diagram of one Encino house with a single design-build team versus a split architect and contractor handoff

Why it matters

Change is easier before the City sees the set.

Once drawings are in review or on site, a revision can move permits, consultants, and the calendar. That is normal. It is not free.

121 keeps the conversation in Encino / Los Angeles so you can see the trade-off before we redraw.

How we work

Talk, draw, revise, then build.

Four-step diagram of 121 Design Build's one-team path from conversation and brief through design, permits, and construction

01

Conversation and brief

We talk through the work so the Encino team knows what you want before drawings start.

02

Schematic and development

Feedback during schematic and design development is welcome. That is the cheapest time to change the idea.

03

Permits

We coordinate drawings with the City of Los Angeles. A later change can move the review. Approvals are never guaranteed.

04

Build

The same Encino team can construct the project. Later changes on site still cost more time and money.

Honest scope

What 121 actually does, and what we do not.

We do

Feedback through schematic, design development, and later

Yes, we welcome feedback throughout the design process. Whether it's during schematic design, design development, or even later in the project, we'll work with you to make adjustments as needed.

We do not

Free later changes, or legal advice

We do not claim later changes are free. We do not invent a fee here. We do not give legal advice. We do not guarantee City of Los Angeles approvals.