Should I start contractor bids for an ADU/JADU before getting the permit?

It's best to wait until your ADU/JADU plans are submitted to the city for permit processing before requesting contractor bids to ensure accurate pricing and timeline expectations.

Direct answer

Wait until plans are submitted.

It's best to wait until your ADU/JADU plans are submitted to the city for permit processing before requesting contractor bids to ensure accurate pricing and timeline expectations.

That is the Encino / Los Angeles practice. A city-submitted ADU or JADU plan set gives contractors something accurate to price.

Pricing and timeline after submittal are an aim, not a guarantee. We do not invent bid amounts. This is not legal advice.

ADU bids after submittal

Submitted plans. Then accurate ADU bids.

Editorial diagram of one Encino house with a single design-build team versus a split architect and contractor handoff

Plans

Finish the Encino ADU or JADU drawings first.

Submit

Then submit to the city before you ask for bids.

Bids

No dollar amounts on this page. Call (424) 600-2100.

Editorial diagram of one Encino house with a single design-build team versus a split architect and contractor handoff

No invented amounts

An Encino ADU plan set, no bid table.

121 Design Build is in Encino. Bid after the ADU/JADU plans go in, not before.

We do not invent dollar amounts, licenses, volumes, or years. Fees after review are an aim, not a guarantee.

How we work

When to bid an ADU

Four-step diagram of 121 Design Build's one-team path from conversation and brief through design, permits, and construction

01

1. Converse

We start with the Encino lot and the ADU or JADU drawings that still need to finish.

02

2. Submit

It's best to wait until those plans are submitted to the city for permit processing.

03

3. Bids

Then contractors can bid with accurate pricing and timeline expectations.

04

4. Next step

Then we talk next steps on the Encino lot.

Honest scope

What 121 actually does, and what we do not.

We do

Wait for submittal

It's best to wait until your ADU/JADU plans are submitted to the city for permit processing before requesting contractor bids to ensure accurate pricing and timeline expectations.

We do not

A bid before plans

We do not invent a bid date or an ADU price before the Encino plans are submitted.

Ask when ADU bids should start on your Encino lot.

If you have an ADU or JADU in Encino / Los Angeles, start with a conversation about when bids should start. Call (424) 600-2100.